HVAC Engineering Service

Cooling & Heating Load
Calculation Service

Send us your drawings. We return a complete, ASHRAE or CIBSE-compliant load analysis — room-by-room, with equipment sizing guidance — within 3–5 working days.

What We Do

HVAC Load Calculation from Drawings — Online, Worldwide

Accurate cooling and heating load calculations are the foundation of every well-engineered HVAC system. Undersized equipment causes occupant discomfort; oversized equipment wastes capital, consumes excess energy, and short-cycles. Green Power Corporation has been performing building load analyses for 30+ years — from single offices to international airports.

Our remote HVAC load calculation service lets engineering firms, contractors, and building owners worldwide access that expertise without travel or retainer. Submit your drawings by email, and we return a stamped-quality calculation report — ready to submit to your authority or use for equipment procurement.

ASHRAE Fundamentals CLTD/CLF Method Radiant Time Series CIBSE Guide A HAP Software Hevacomp

Why Accurate Load Calculations Matter

  • Right-sized equipment means lower capital cost and better energy efficiency
  • Lenders and authorities often require a formal load calculation report
  • LEED, Estidama, and GRIHA rating schemes require verified load data
  • Equipment warranties can depend on correct sizing documentation
  • Prevents costly on-site corrections during commissioning
What You Receive

Deliverables Included in Every Report

Room-by-Room Cooling Load

Sensible and latent cooling load for every zone, broken down by wall, roof, glass, solar, occupants, lighting, equipment, and infiltration.

Building Total Cooling Load

Summarised cooling tonnage and kW at peak design conditions, with diversity factors applied where appropriate.

Heating Load Analysis

Steady-state winter heating load per zone and building total, for boiler or heat pump sizing.

Equipment Sizing Guidance

Recommended chiller or DX unit capacity, AHU airflow, FCU tonnage per zone — ready for procurement or tendering.

Ventilation Load

Outdoor air sensible and latent loads per ASHRAE 62.1 or project specification, included in totals.

PDF Report + Excel Summary

Professionally formatted PDF calculation report plus an editable Excel summary of all zone and building totals.

What We Need From You

Inputs Required

To start a heat load calculation from drawings, we typically need the following. Don't worry if some information is missing — we'll tell you what's essential and what can be estimated.

  • Architectural floor plans (PDF, DWG, or Revit — any format)
  • Building location / city (for design-day climate data)
  • Occupancy schedule and number of people per zone
  • Lighting load (W/m² or fixture schedule)
  • Equipment and appliance loads per zone
  • Wall, roof, and glazing construction details (or we use ASHRAE defaults)
  • Ventilation requirements (ASHRAE 62.1, local code, or specify L/s per person)
  • Any special requirements (cleanroom, server room, kitchen, etc.)
Turnaround Times

Delivery Schedule

Project SizeStandardExpress
Single zone / small office1–2 daysSame day
Multi-zone / floor (up to 20 zones)3–4 days1–2 days
Full building (20–60 zones)5–7 days2–3 days
Large complex / hospital / airport10–14 daysBy agreement

Express service available at a surcharge. All timelines start from receipt of complete inputs.

Why Trust Us

30 Years of Real Projects Behind Every Calculation

Any engineer can run a spreadsheet. What sets Green Power Corporation apart is that our engineers have designed, installed, and commissioned the systems we calculate — including the HVAC for Islamabad International Airport, multiple hospital campuses, pharmaceutical manufacturing facilities, and major commercial towers.

When we produce a cooling load calculation from drawings, it's checked against the judgment of engineers who have seen what happens when calculations are wrong in the field. That operational experience is baked into every report we issue.

View Our Project Portfolio →

Software We Use

HAP (Hourly Analysis Program) · Hevacomp · Manual ASHRAE calculations with cross-verification · AutoCAD MEP for layout integration

Standards Applied

ASHRAE Handbook of Fundamentals · ASHRAE 62.1 ventilation · CIBSE Guide A & B · Client-specified local codes

Sectors Served

Offices · Healthcare & hospitals · Pharmaceutical & cleanrooms · Hospitality · Retail & F&B · Aviation · Data centres

Free Tool

Want a Quick Estimate First?

Try our free HVAC load calculator — enter your floor area, design temperatures, and space type to get cooling kW, heating kW, tonnage, and a recommended system type in seconds. No drawings needed, no sign-up.

  • Cooling & heating loads with breakdown
  • Metric and imperial units
  • Runs entirely in your browser
Open Free Calculator →

For preliminary sizing only. Need a stamped report? Request a quote below.

Get Started Today

Request Your Load Calculation Quote

Email us your drawings or fill in the form — we'll respond with a scope and fixed fee within 24 hours.