Fire Fighting System Design —
NFPA & Local Standards
Complete fire suppression and protection system design — sprinklers, hose reels, hydrants, and pump sizing — with hydraulic calculations and construction-ready layout drawings.
Professional Fire Fighting Design Service
Our fire fighting design service covers the full scope of active fire suppression and protection systems — from automatic sprinklers to hydrant and hose reel networks, fire pump stations, and suppression system schematics.
Designs are produced to NFPA standards (or locally applicable codes such as BS EN 12845, UAE Civil Defence requirements, or DM guidelines) and include hydraulic calculations sufficient for authority submission and contractor tendering.
Systems We Design
- Wet pipe sprinkler systems (NFPA 13)
- Dry pipe and pre-action sprinkler systems
- Deluge systems for high-hazard areas
- Fire hose reel systems
- Internal and external hydrant networks
- Fire pump and jockey pump sizing
- Fire water storage tank sizing
- Foam suppression systems
- Kitchen suppression (Ansul / wet chemical)
- Fire detection integration notes
Fire Fighting Design Deliverables
Hydraulic Calculations
Full hydraulic calculation for the most demanding design area, demonstrating compliance with NFPA 13 / local code flow and pressure requirements.
Sprinkler Layout Plans
AutoCAD sprinkler head layout with pipe sizes, branch lines, cross mains, and zone valves shown on architectural backgrounds.
Riser Diagram & Schematic
Riser diagram showing system layout from pump room through to each floor zone, with valve and fitting schedule.
Pump Station Design
Fire pump, jockey pump, and diesel standby pump sizing and selection, with pump room layout and associated pipework schematic.
Water Storage Sizing
Fire water storage tank capacity calculation based on system demand flow rate and required duration per applicable code.
Authority Submission Package
Complete documentation package formatted for Civil Defence / building authority submission, with design basis statement.
Fire Fighting Systems Designed and Installed Across Pakistan
Green Power Corporation has designed and installed fire fighting systems in hospitals, pharmaceutical plants, commercial towers, airport facilities, and food-service chains across Pakistan. The Islamabad International Airport, Shalimar Hospital, Tricon Centre, and McDonald's multi-branch rollout are among the fire protection projects in our portfolio.
Our fire engineers understand the full commissioning and testing process — because we have performed it on site. That means our remote designs include the commissioning specifications, test procedures, and acceptance criteria that an installer actually needs.
View Project Portfolio →What We Need From You
Architectural floor plans · Building occupancy classification · Number of floors and heights · Water supply data (if available) · Applicable code / authority (NFPA, UAE CD, BS, etc.)
Typical Turnaround
Single-floor sprinkler layout: 3–5 days · Full building fire package: 1–3 weeks · Hydraulic report only: 2–3 days
Request Your Fire Fighting Design Quote
Send us your floor plans and tell us the applicable code. We'll respond with scope and fee within 24 hours.